|
Bay Area Forum for Asians
|
| Nutopia Forum Index |
|---|
|
Nutopia Forum Index
|
| View previous topic :: View next topic |
Page 1 of 1
|
| Man buried alive at Milpitas construction site Tue Jan 31, 2012 10:21 am |
|---|
| Author | Message | |
|
SFGateKeeper 萬人迷
![]() Joined: 10 May 2010 Posts: 5574
|
Post subject: Man buried alive at Milpitas construction site |
|
Man buried alive at Milpitas construction siteMILPITAS, Calif. (KGO) -- A construction worker was killed at a jobsite after it had been ordered to shut down for safety violations. The tragedy happened at a home being built in Milpitas. At the Calaveras Ridge Estates at 10:30 a.m. Saturday a 37-year-old carpenter was killed when a 12-foot wall of unstable soil caved in on him. "We got a call from the police dispatch. I think, half an hour later the contractor made the call to 911," said Keyvan Irannejad, the chief building inspector for the city of Milpitas. Irannejad is the only one authorized by the city to talk with reporters about what happened. He says the contractor tried to pull the carpenter from the ditch at 10:30 a.m. when the cave-in happened, but was unable to rescue the man. When police and firefighters showed up, it was too late and rescuers determined it was also too dangerous with the hillside and the ditch still unstable. "We have another contractor onsite. They excavated the site of the area in which the body is buried and within 45 minutes, one of the workers, in the sense of being safe [will] reach out and pull the body out," said Irannejad. The contractor for U.S. Sino Investments has left the country. The project manager told ABC7 he is in China. We also learned that the city of Milpitas issued a stop work order on this project last Wednesday, three days before the accident because a building inspector determined that the ditch was a safety hazard. There was not adequate shoring to prevent a cave-in. "Apparently, the contractor over the weekend ignored that notice and they've been working there," said Irannejad. ABC7 asked Irannejad if he talked with the company about ignoring the stop work order and what was the city's position on it. "Well, obviously when a stop work order is issued, it is illegal to continue with the work and they can be subject to the fine and the penalties. Also, Cal/OSHA is onsite and they did receive a copy of our stop work notice," replied Irannejad. Cal/OSHA arrived on the site in the late afternoon on Monday. Another contractor was called in over the weekend to start removing the dirt on top of the body. The 37-year-old carpenter is still unidentified. http://abclocal.go.com/kgo/story?section=news/local/south_bay&id=8525108&rss=rss-kgo-article-8525108 |
||
|
|
||
| Back to top |
| Man buried alive at Milpitas construction site Tue Jan 31, 2012 10:21 am |
|---|
| Author | Message | |
|
Special Offers! 萬人迷
![]() Joined: 10 May 2010 Posts: 5574
|
Post subject: |
|
|
足球宝贝裸图 661mi.com 玉碎宫庭红绿间 春暖花开sex8欧美转帖 WWW,sex8.cc@gmail,com www.mesubuta cqwww.net_色欲教室 杏美月 刘煜杉的风骚自拍照有身份 证明[81P caoxiaojiebi 性感美女照片 缇?濂崇????哄??х? 王美莼 suki 夜店 www.156sao.com 脫光光 樹 辣妹 亚洲无码原创 春暖花开 台湾 鑫光大刘洋 雀屏怨 火辣內衣 meinvtuoyitu http://www.chunseba.com 陳以仁 秋元里奈 kuaibo free porn 樱井莉亚 ed2k罪之恋 琚??哄????浜哄???甯?浜?濞? 255i浜轰??烘? ?ㄩ????绂???绯诲??寮?涓藉? 寮?棣ㄧ????澶ц??婀胯韩 性吧有你春暖花开 亚洲有码区 田中瞳无码 性吧春暖 亚洲无码区 sex8 性吧有你 凍蟹 食譜 ?跺? ?????? 嘉屄 ?怡 宀╁???寸华 天海翼AV ?茬?版????浜轰??烘?????? 春暖花开欧洲性爱区 雪景 性吧、春暖花开、亚洲无码 泰国娜塔莉亚 ek2d欧美 性吧春暖花开 村上凉子 sex http://www.kk44kk.net/?tiao |
||
|
|
||
| Back to top |
| Back to top |
|
Related Links: Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site Man buried alive at Milpitas construction site |
|
Powered by phpBB 2001, 2002 phpBB Group
Powered by SO Software Online
Theme designed by What Is Real!? 2005
|
| All times are GMT + 8 Hours |